Matanuska Susitna Borough, Alaska Roofing Permit Regulations and County Ordinances for Unincorporated Areas
Matanuska-Susitna Borough Roofing Permit Requirements
In the Matanuska-Susitna Borough (MSB), Alaska, roofing projects on properties in unincorporated areas are primarily governed by the MSB Permit Center, which handles land use permits, floodplain development permits, and fire/life safety plan reviews. Traditional building permits for single-family residential construction are not separately administered at the borough level. Instead, the focus is on ensuring compliance with land use regulations.
Permit Authority and Jurisdiction
The Matanuska-Susitna Borough Permit Center is responsible for development permits in all unincorporated areas of the borough. Properties within the city limits of Wasilla, Palmer, or Houston are subject to their respective city's permit requirements.
Rules for Properties in Unincorporated Areas
For properties in unincorporated areas, several types of permits may be relevant to roofing projects, depending on the specific circumstances:
- Land Use Permit: Required for new construction, additions, changes of use, clearing, grading, excavation, and resource extraction. This permit ensures that land use follows borough regulations. A Mandatory Land Use Permit (MLUP) is specifically required if you plan to build or place any structure within 75 feet of a watercourse or waterbody.
- Floodplain Development Permit: If the property is located within a Federally Designated Flood Hazard Area, a Floodplain Development Permit is required before any development can occur.
- Fire/Life Safety Plan Review: This review is necessary before construction, alteration, or occupancy changes for structures where people work, play, or spend time. However, residential housing that is three-plex or smaller is generally exempt, unless the property is within the city limits of Palmer.
- Multifamily Residential Permit: Required for residential developments of more than six units per lot or new construction exceeding two dwellings per 40,000 square feet.
It's important to note that even if a project is exempt from one type of permit, other permit requirements may still apply. It is advisable to confirm specific needs with the Permit Center before starting any work.
Application Process and Requirements
The general application process involves determining the applicable permit type, preparing required documents such as a site plan, and submitting the application online via the EnerGov portal or in person at the Permit Center. Fees are set annually and must be paid. After review and approval, a certificate may need to be posted on-site, and a final inspection scheduled upon project completion.
Resources to Learn More
- Matanuska-Susitna Borough Permit Center
- Matanuska-Susitna Borough Permit Center Information
- Matanuska-Susitna Borough Official Website
- Calculate a Roofing Replacement Project in Matanuska Susitna Borough, Alaska
- Find Roofing Contractors in Matanuska Susitna Borough
- Find Roofing Contractors in Alaska