Permit Requirements for Lexington, Oregon

For HVAC projects in Lexington, determining the correct permitting authority depends on whether the project site is located within the incorporated city limits or in an unincorporated area of Morrow County.

Authority Having Jurisdiction (AHJ)

Most jurisdictions require permits for HVAC work to ensure safety and code compliance. The governing body responsible for issuing these permits varies by specific location:

General HVAC Guidelines

Permits are usually required for new installations, structural modifications, or major repairs. While minor maintenance or cosmetic updates may be exempt, landowners should always verify local codes before work begins.

Because Lexington is located within Morrow County, the following broader county regulations may also apply to your project:

Oregon, Morrow County Hvac Permit Regulations and County Ordinances for Unincorporated Areas

Morrow County HVAC Permit Requirements

In unincorporated Morrow County, Oregon, building permits are required for mechanical work, which includes HVAC systems. The county contracts with the City of Boardman for building permit services. Contractors performing this work must be licensed through the Oregon Construction Contractors Board (CCB), and electrical contractors need BCD certification.

Permit applications are submitted through the Citizenserve online portal. Before applying, it's necessary to check zoning requirements with the planning department and obtain a zoning permit if applicable. Plans must comply with the Oregon Residential Specialty Code and Oregon Structural Specialty Code.

Permit fees are calculated based on the project's valuation. Inspections can also be scheduled through the Citizenserve portal.

Resources to Learn More

The following statewide building codes and regulations apply universally to all jurisdictions within Oregon:

Oregon Hvac Legislation, Codes, and Guidelines

Oregon HVAC Building Codes and Legislation

Oregon regulates heating, ventilation, and air conditioning (HVAC) systems through a series of state-specific specialty codes. These codes are updated periodically to incorporate modern standards, energy efficiency requirements, and safety protocols. As of April 2026, the primary codes governing mechanical systems in the state include the 2025 Oregon Mechanical Specialty Code (OMSC) and the 2023 Oregon Residential Specialty Code (ORSC).

The 2025 OMSC, which became mandatory on April 1, 2026, is based on the 2024 editions of the International Mechanical Code (IMC) and the International Fuel Gas Code (IFGC), with specific Oregon amendments. For residential construction, the 2023 ORSC provides the governing standards. Recent legislative and regulatory updates have introduced significant changes, including new requirements for heat pumps in certain new residential construction projects where split-system air conditioning is installed, aimed at improving energy efficiency and reducing long-term utility costs for homeowners.

Primary Regulatory Agencies

The administration and adoption of these building codes are managed by the following state entities:

Resources to Learn More

Help Us Improve This Guide

Did you find a dead link, or do you have the direct link to the Lexington permit application portal? Help us keep this information accurate by submitting an update.