Georgia, Bartow County HVAC Permit Regulations and County Ordinances for Unincorporated Areas
Bartow County Building & Safety Jurisdiction
In Bartow County, Georgia, the Building Inspections Division, which operates under the Community Development Department, is responsible for the administration and enforcement of adopted building codes. This division handles permitting and inspections for properties located within the unincorporated areas of the county. If a property is located within an incorporated city, the respective city's building department—not the county—is responsible for issuing permits and conducting inspections.
HVAC Permit Requirements for Unincorporated Areas
A permit is required to install, alter, or repair a heating or cooling system in unincorporated Bartow County. The county requires that all work comply with the building codes adopted by the State of Georgia and Bartow County. Key requirements and procedures include:
- Permit Application: Applicants must download and complete the appropriate Residential or Commercial HVAC Permit Application from the county's website.
- Contractor Requirements: Generally, a Georgia state-licensed contractor must apply for the permit and provide necessary licensing documentation.
- Owner-Builder Exception: A homeowner may obtain permits and perform HVAC work themselves, provided they are the owner and occupant of the single-family dwelling.
- Submission Process: Completed permit applications and required documentation should be submitted via email to the county's designated permit email address.
- Inspections: Once a permit is issued, inspections must be requested through the county's official online form. All supplemental permits (such as HVAC) must be filled out and signed before an inspection can be requested.